Client Home Depot Location Apple Valley, CA Project Details Products Used: StreetPrint Project Size: 14,000 sq/ft Installation Date: January 2007 Installation Duration: one week Project Synopsis Work was completed under difficult weather conditions. Temperatures were as low as 28 degrees with heavy winds the morning the coating was applied. Coating is not guaranteed if temperatures are below 50 degrees. Job still looks great and there is no lifting of the coating. (as of November 2008) |